    压水堆核能供汽长距离输送参数提升方案及经济性分析

    Economic Analysis of Parameter Improvement Schemes for Long-distance Transportation of Nuclear Steam Supply in Pressurized Water Reactors

    • 摘要: 基于压水堆核能供汽长距离输送的需求,本文提出电加热、蒸汽压缩机和混合加热3种蒸汽参数提升技术,对40 km输汽场景开展热力学设计与经济性对比分析。结果表明:在核电厂内,利用电加热器将蒸汽二次过热至290 ℃,能维持蒸汽管道末端12 K的过热度,每吨蒸汽的成本增量最低,仅15.19元;热网处设置两级蒸汽压缩,能保障蒸汽过热运输,但系统设备投资较高,每吨蒸汽成本增加29.34元;针对混合加热技术,需要掺混质量分数为28%的高价火电蒸汽,导致每吨外供蒸汽成本增加33.96元,且系统波动显著;综合技术成熟度、经济性与运行稳定性,核电厂内电加热技术是突破核能供汽远距离传输的最优方案。

       

      Abstract: To address the requirements for the long-distance transportation of nuclear steam supply from pressurized water reactors, three steam parameter improvement technologies were proposed, including electric heating, steam compression, and hybrid heating. Thermodynamic design and economic analysis were conducted for a 40 km steam transmission scenario. Results show that within the nuclear power plant, using an electric heater to reheat the steam to 290 ℃ can maintain a superheat degree of 12 K at the end of the steam pipeline, with the lowest cost increment per ton of steam at only 15.19 RMB. Installing two-stage steam compression in the heating network ensures superheated steam transportation, but the system equipment investment is high, increasing the cost by 29.34 RMB per ton. For the hybrid heating technology, mixing with 28% mass fraction of high-priced thermal power steam leads to a cost increase of 33.96 RMB per ton of externally supplied steam, accompanied by significant system fluctuations. Considering technical maturity, economic efficiency, and operational stability, the in-plant electric heating technology is the optimal solution for breaking through the bottlenecks in the long-distance transmission of nuclear steam supply.

       

    /

    返回文章
    返回